FLOOD PROTECTION AND STORM DRAINAGE IMPROVEMENTS

FLOOD MANAGEMENT

This category is primarily comprised of projects recommended in Flood Plain Management Studies of creeks and tributaries. The emphasis is on reduction of severe flood impact on bridges and neighborhoods bordering flood plain areas. Typical projects in this category would be bridge and culvert replacement, creek channelization, detention basins and construction of flood protection levees.

STORM DRAINAGE RELIEF SYSTEMS

Many areas within Dallas are served by storm drainage systems, which have become inadequate after years of continued development. In many cases, because of the high cost of retrofitting improvements in fully developed areas, these projects are proposed for design and construction by phases.

EROSION CONTROL

Erosion control projects are recommended for structures threatened by creek or channel bank erosion. Typical structures include streets, culverts, bridges, alleys and homes. Erosion occurring in areas not associated with creek banks or man-made channels is not included in this category.

Project

Cost Estimate

Council District

Project Category: FLOOD MANAGEMENT

$5,120,000

 

5-Mile Creek Study: Polk/IH 35

$50,000

4

Cedar Creek Bridge @ Eighth

$1,600,000

6

Cedar Creek Culverts @ Beckley

$550,000

6

Elam Creek Detention Basin

$1,300,000

4

Estes Branch Culvert @ St. Augustine

$465,000

5

McKamy Branch, Upper-Mapleshade to 1200' d/s

$300,000

12

Prairie Creek Voluntary Purchase - 2335 Prairie Creek Road

$100,000

4

Voluntary Purchase - 7125 Winding Creek

$227,500

12

Voluntary Purchase - 7133 Winding Creek

$227,500

12

White Rock Creek @ Greenville Ave.

$300,000

10, 13

Project Category: STORM DRAINAGE RELIEF SYSTEM

$8,537,300

 

Alcalde Street 300

$80,000

2

Arroyo 2601

$182,000

14

Longbranch Area

$506,000

10

Marianne 17506

$72,000

12

Meadowcreek 5840

$50,000

12

McKinney Ave. Drainage Blackburn to Hall (To be matched with private funds)

$465,300

14

Mill Creek - Phase 1

$3,000,000

9,14

Pemberton Hill - Phase 2

$612,000

5

Pentagon Drainage: Marsalis/Yewpon (phase 1 engineering)

$175,000

4

Paloduro/Rand drainage (phase 1)

$180,000

4

Rush Creek - Engineering

$1,400,000

9

State-Thomas/Clyde Alley

$1,650,000

14

State-Thomas/Maple-Routh Connection

$165,000

14

Project Category: EROSION CONTROL

$712,700

 

Alexander 7008

$36,000

9

Audelia Branch @ Audelia Bridge

$50,000

11

Audelia Branch @ Whitehurst Bridge

$120,000

10

Jackson Branch @ Whitehurst Bridge

$100,000

10

Harvest Glen 6804

$35,900

12

Old Preston Court 17919

$41,800

12

Joe' s Creek@ Forest Lane

$35,000

13

Joe' s Creek North of Merrell

$200,000

13

Woody Branch Erosion: 5855, 6021 Hunters View

$94,000

4

 

 

 